Rigid Solar Panel for Kalimantan Prima Coal at the Sangatta Office in East Kalimantan

A 50 kVA solar power system installed at KPC’s Sangatta office, supporting the company’s commitment to sustainable energy and reducing carbon emissions across its operations.

Company

PT Kaltim Prima Coal

Placed Installation

50 kVA

Solar Power

Time

August 2024 - Present

Documentation

Installation Result of Mobile HRES Tower for KPC Sangatta Mine

Mobile HRES Tower successfully installed at KPC Sangatta Mine, enhancing site efficiency and connectivity.

Powering A Greener Future Through Original Innovation

Aerion delivers wind, solar, and green hydrogen systems engineered in-house for clean, reliable, and future-ready energy.

TRY THE DEMO. NO SIGN-UP NEEDED!

© 2025 Aerion Energy. All rights reserved.

Powering A Greener Future Through Original Innovation

Aerion delivers wind, solar, and green hydrogen systems engineered in-house for clean, reliable, and future-ready energy.

TRY THE DEMO. NO SIGN-UP NEEDED!

© 2025 Aerion Energy. All rights reserved.

Powering A Greener Future Through Original Innovation

Aerion delivers wind, solar, and green hydrogen systems engineered in-house for clean, reliable, and future-ready energy.

TRY THE DEMO. NO SIGN-UP NEEDED!

© 2025 Aerion Energy. All rights reserved.