Pilot Project Mitratel: Pioneering the Future of Hybrid Renewable Energy
This landmark initiative marks a breakthrough collaboration with Mitratel, integrating solar and wind hybrid systems to power remote telecommunication towers sustainably.
Company
PT Dayamitra Telekomunikasi Tbk
Placed Installation
3.000 W
Solar Power
2,000 W
Wind Power
5.000 kVA
Load
Time
March - July 2025
Documentation
Anti theft battery project
Innovation in battery protection through integrated anti-theft mechanisms and smart monitoring.
Manufacturing Propellers
Manufacturing high-efficiency propellers tailored for Mitratel’s renewable energy prototype.
Inspection by the Mitratel Board of Directors
Project site visit and inspection by Mitratel’s Board of Directors to review progress and performance.
Installation Result
3D visualization of the completed installation showcasing the final system layout.




